Home › Energy Code Compliance

Energy Code Compliance by the Performance Path – Design the Building You Want

Outsourced, AI-assisted energy modeling for architects and engineers – IECC C407, ASHRAE 90.1 Appendix G and Energy Cost Budget – fixed price, done in days, signed by a Professional Engineer.

For architects and engineers: when the prescriptive tables get in the way of your design, a whole-building energy model proves the building as a whole beats the code. Opturas is your outsourced energy modeler – AI-assisted, PE-signed, fixed price, and done in days so your permit isn’t held up.

Why the performance path

The prescriptive path checks every wall, roof, window, light fixture, and piece of HVAC equipment against a table. Miss one line – too much glass, a wall assembly that doesn’t fit the table, an HVAC system the table never anticipated – and you redesign, even when the building as a whole is efficient.

The performance path looks at the whole building instead. We model your design from the plans and compare it with the code’s reference building of the same size and shape. If your building’s annual energy cost meets the code target, it complies – and you keep the design.

What the performance path lets you do

  • More glass and bigger windows – trade window area against better glazing, HVAC, or lighting.
  • Your choice of HVAC – get credit for high-efficiency equipment, heat pumps, energy recovery, and controls.
  • Unique shapes and assemblies – walls, roofs, and spaces that don’t fit the prescriptive tables.
  • Avoid costly upgrades – skip prescriptive items that add cost without helping your building.

Mandatory code provisions (controls, air leakage, duct and pipe insulation, etc.) still apply on the performance path. We focus only on performance-path modeling – we do not prepare prescriptive forms.

How trade-offs work (illustrative)

Annual energy cost compared with the code budget

Code energy budget = 100100Codebudget+12Moreglass−18BetterHVAC−9LED +controls85Yourdesign

The design adds glass but still comes in 15% under the code budget – so it complies without the prescriptive window limit.

Prescriptive path

  • Every component must meet its table
  • Window area capped
  • One miss = redesign
  • No credit for better systems

Performance path ✔

  • Whole building judged together
  • Trade glass for HVAC or lighting
  • Credit for efficient systems
  • Keeps the design intent

AI-assisted energy modeling – faster, more accurate, less expensive

We built our own AI and automation tools around the proven eQUEST / DOE-2 simulation engine. The tedious work – plan takeoffs, input files, simulation runs, and report tables – is automated, so our engineering time goes into checking your building, not typing numbers.

1. Plans inYou upload the architectural, mechanical, electrical, and plumbing set.
2. AI plan inspectionAI reads the drawings: areas, walls, roofs, windows, lighting, HVAC, and water heating.
3. Models builtBaseline and proposed eQUEST input files are generated from the takeoff.
4. DOE-2 runsThe DOE-2 engine simulates the baseline (all required orientations) and your design, hour by hour.
5. PE reviewA Professional Engineer checks the models against the plans and signs the report.
Days, not weeksAutomation handles the takeoffs, input files, and simulation runs, so your report is ready in days – no permit delays waiting on the energy model.
Fixed-price quoteSend the plans and get a fixed price, usually within one business day. Less manual labor means lower fees.
Your outsourced modelerNo energy modeler in-house? We work as part of your design team, rerun design options, and answer plan reviewer comments until the permit is issued.
Help early in designBring us in at schematic design – we can test glazing, envelope, and HVAC options before the drawings are final, so there are no surprises at permit.
Consistent and accurateThe same checks run on every model, every time, and a Professional Engineer reviews every result.

Codes and methods

IECC Total Building Performance (Section C407), ASHRAE 90.1 Energy Cost Budget method, and ASHRAE 90.1 Appendix G Performance Rating Method – whichever your jurisdiction accepts. The building department (authority having jurisdiction) has the final say on the code edition and method.

Signed by a Professional Engineer

Every model is reviewed and every compliance report is signed by a registered Professional Engineer, ready for your building department submittal.

Common questions

What is the performance path for energy code compliance?

An alternative to the prescriptive checklist: an energy model of your proposed building is compared with a code reference building. If the proposed building’s annual energy cost meets the code target, it complies, even if some components don’t meet the prescriptive tables.

When should I use it?

When the design has more glass than the prescriptive limit, unusual wall or roof assemblies, an HVAC system the tables don’t fit, or when meeting every prescriptive item would add cost. It is also the way to get credit for efficient systems.

What does the building department receive?

A compliance report from the simulation with the baseline and proposed inputs, energy use and cost by end use, and the comparison with the code target, plus the documentation the reviewer needs to match the model to the plans. We answer reviewer comments.

How do you use AI – and who checks it?

AI reads the plan set and builds the model inputs; the DOE-2 engine does the simulation. A Professional Engineer reviews every model and signs every report.

Get a performance-path quote