Home › Energy Code Compliance
Outsourced, AI-assisted energy modeling for architects and engineers – IECC C407, ASHRAE 90.1 Appendix G and Energy Cost Budget – fixed price, done in days, signed by a Professional Engineer.
For architects and engineers: when the prescriptive tables get in the way of your design, a whole-building energy model proves the building as a whole beats the code. Opturas is your outsourced energy modeler – AI-assisted, PE-signed, fixed price, and done in days so your permit isn’t held up.
The prescriptive path checks every wall, roof, window, light fixture, and piece of HVAC equipment against a table. Miss one line – too much glass, a wall assembly that doesn’t fit the table, an HVAC system the table never anticipated – and you redesign, even when the building as a whole is efficient.
The performance path looks at the whole building instead. We model your design from the plans and compare it with the code’s reference building of the same size and shape. If your building’s annual energy cost meets the code target, it complies – and you keep the design.
Mandatory code provisions (controls, air leakage, duct and pipe insulation, etc.) still apply on the performance path. We focus only on performance-path modeling – we do not prepare prescriptive forms.
Annual energy cost compared with the code budget
The design adds glass but still comes in 15% under the code budget – so it complies without the prescriptive window limit.
We built our own AI and automation tools around the proven eQUEST / DOE-2 simulation engine. The tedious work – plan takeoffs, input files, simulation runs, and report tables – is automated, so our engineering time goes into checking your building, not typing numbers.
IECC Total Building Performance (Section C407), ASHRAE 90.1 Energy Cost Budget method, and ASHRAE 90.1 Appendix G Performance Rating Method – whichever your jurisdiction accepts. The building department (authority having jurisdiction) has the final say on the code edition and method.
Every model is reviewed and every compliance report is signed by a registered Professional Engineer, ready for your building department submittal.
An alternative to the prescriptive checklist: an energy model of your proposed building is compared with a code reference building. If the proposed building’s annual energy cost meets the code target, it complies, even if some components don’t meet the prescriptive tables.
When the design has more glass than the prescriptive limit, unusual wall or roof assemblies, an HVAC system the tables don’t fit, or when meeting every prescriptive item would add cost. It is also the way to get credit for efficient systems.
A compliance report from the simulation with the baseline and proposed inputs, energy use and cost by end use, and the comparison with the code target, plus the documentation the reviewer needs to match the model to the plans. We answer reviewer comments.
AI reads the plan set and builds the model inputs; the DOE-2 engine does the simulation. A Professional Engineer reviews every model and signs every report.